1. Analysis and evaluation of work in the field of occupational safety and health according to current standards.

2. Organization of work on labor protection in the enterprise.

3. Assessment of workplaces.

4. Environmental review (evaluation of the area to justify optimal site selection for object location).

5. Preliminary Environmental Impact Assessment (Pre-EIA) as part of the pre-planning, pre-project documentation.

6. Environmental Impact Assessment (EIA) of the designed and operating enterprises as a part of the preliminary and detailed design documentation.

7. Development of "Environmental Protection" section in the one-stage technical design.

8. Development of draft standards for maximum permissible discharges (MPD) of pollutants in water bodies.

9. Development of draft standards for maximum permissible loads (MPN) and maximum permissible levels (MPL) of industrial enterprises.

10. Organization and implementation of industrial environmental monitoring.

11. Conducting Environmental Audits and issuing Energy Audit reports.

12. Development of projects to establish water protection zone.

13. Inventory of greenhouse gas emissions, development of GHG emission inventory certificates.

14. Justification of establishment of the sanitary protection zone for industrial facilities.

15. Development of restoration projects for disturbed lands.

16. Development of draft standards for waste management.

17. Development of Waste Certificate.

18. Development of the Environmental Certificate of the enterprise.